Support at local and national level, being granted Project of National Interest (“PIN”) status.įirst 15MW ready for service Q1 2023.

Connected to 62 countries and 91 locations, including the cables Ellalink, 2Africa, Equiano and Main One.ĭesigned to meet high security standards, such as FISMA (Moderate), HIPPA, ISO 27001-2013, PCI-DSS, SSAE18 SOC II. Southwest quadrant of Europe with dense subsea and terrestrial fiber connections. Hyperscale campus with Modular and flexible design from 2.5 MW data hall to 60 MW individual buildings.ġ5 MW to be delivered Q1 2023 and remaining campus up to 2027.Ĭonnected to grid with direct wire renewable and hybrid solutions, such as batteries and green hydrogen.Ĭoncurrently maintainable, Hyperscale grade data center (meets and exceeds Tier III by TIA), resilient site (100% uptime).

Industrial land with ability to scale in less than 1.5 hours drive from Lisbon.